Sungrow Achieves 20GW Shipment Milestone in India
Sungrow entered the Indian market in 2014 with three offices in New Delhi, Mumbai, and Bengaluru. It established a manufacturing facility with a 10 GW annual capacity.
Sungrow entered the Indian market in 2014 with three offices in New Delhi, Mumbai, and Bengaluru. It established a manufacturing facility with a 10 GW annual capacity.
A solar power adoption initiative which included installing 24 solar-powered water pumps and five solar-powered vaccine refrigerators—all operational, changed the lives of the communities living in Kalalé.
In line with Indian Railways policy, we target to reduce water consumption by 20% by 2023 and have set up MRF (material recovery facilities) for waste management in more than 250 stations